聯(lián)合站的設(shè)計(jì)是以儲(chǔ)運(yùn)教研室下達(dá)的的任務(wù)書為依據(jù)完成的。該聯(lián)合站東西350米,南北250米,年處理量為270萬噸,采用密閉流程。
站外來油經(jīng)三相分離器、加熱爐、油氣分離器、電脫水器、穩(wěn)定塔等首先進(jìn)行油、氣、水的分離,再經(jīng)外輸泵和計(jì)量間等向外輸送。站內(nèi)氣體直接送往氣體處理廠進(jìn)行處理。
站內(nèi)劃分為油罐區(qū),污水處理區(qū),工藝區(qū),配電區(qū),消防區(qū),輔助生產(chǎn)區(qū),設(shè)計(jì)時(shí)設(shè)計(jì)了有泵流程,同時(shí)也考慮了停電流程,即使故流程。
根據(jù)任務(wù)書所給的站處理量和各種設(shè)計(jì)參數(shù),首先初步選擇了各工藝段設(shè)備,接著確定了總平面布置和聯(lián)合站的工藝流程。與此同時(shí),完成了平面布置圖和流程圖,設(shè)計(jì)并畫了泵房的管線安裝圖。
關(guān)鍵詞:聯(lián)合站;分離;生產(chǎn)流程;設(shè)備
ABSTRACT
The design of WH Central Treating Station was complicated according to the assignment given by the Storage and Transportation Teaching and Researching Department. It is 250 meters long from north to south and 350meters wide from east to west. The treating capacity of the station is about 2,700, 000 tons per year.
The central treating station treats well stream. Its main task is oil, gas and water separation. Gas, crude oil and water mixture flow into the central treating station. First, it goes into three phase separators, then goes through fluid jacket heaters, Two phase separators, electronic dehydrators, stabilization tower ,at last treated crude oil is pumped to the mineral terminal.
The central treating station includes two main processes, they are tight flow process with and without pumps. In addition, the accidental process while power is off was considered.
In the design, we considered the conditions given by the assignment; seclected and checked the equipments and pipelines.The design include three draws.
keyword:central treating station;separate;process;equipment
目錄
第一章前言.........................................................................................................................1
第二章 聯(lián)合站設(shè)計(jì)說明書...................................................................................................2
2.1 設(shè)計(jì)概述.................................................................................................................2
2.2 聯(lián)合站工藝系統(tǒng)概述.............................................................................................2
2.2.1 油氣水混合物的收集.................................................................................2
2.2.2 油、氣、水的初步分離.............................................................................3
2.2.3 原油脫水.....................................................................................................3
2.2.4 原油穩(wěn)定.......................................................................................................3
2.3 站址選擇和總平面布置.........................................................................................3
2.3.1 站址選擇與平面布置概述.......................................................................3
2.3.2 本聯(lián)合站平面布置.....................................................................................4
2.4 流程及流程說明......................................................................................................4
2.4.1 工藝流程的設(shè)計(jì)要求...................................................................................4
2.4.2 原油處理工藝簡介.....................................................................................4
2.5 設(shè)備及管線的安裝布置.........................................................................................5
2.5.1 進(jìn)站閥組的安裝.........................................................................................5
2.5.2 電脫水器的布置安裝.................................................................................5
2.5.3 管線安裝綜述.............................................................................................6
2.5.4 輸油泵房的布置安裝.................................................................................6
第三章聯(lián)合站工藝計(jì)算.....................................................................................................7
3.1 基礎(chǔ)數(shù)據(jù)計(jì)算.........................................................................................................7
3.1.1 設(shè)計(jì)規(guī)模.....................................................................................................7
3.1.2 油氣物性計(jì)算[1]..........................................................................................7
3.2 主要設(shè)備的選擇......................................................................................................8
3.3 原油緩沖罐的計(jì)算...............................................................................................10
3.5 加熱爐的選取.......................................................................................................11
3.6 罐的選取[4]............................................................................................................12
3.7 外輸泵的選取與校核...........................................................................................12
3.8 循環(huán)泵的選取.....................................................................................................15
第四章管線的選取與校核.................................................................................................17
4.1外來油至三相分離器之間管線的計(jì)算................................................................17
4.2 三相分離器到緩沖罐間輸油管線計(jì)算...............................................................19
4.2.1 流速計(jì)算...................................................................................................19
4.2.2三相分離器到緩沖罐輸油管線的計(jì)算....................................................19
4.2.3管線壓降的計(jì)算:....................................................................................20
4.3 緩沖罐到循環(huán)泵之間管線的計(jì)算.......................................................................22
4.3.1 局部摩阻的計(jì)算.......................................................................................22
4.3.2 沿程摩阻的計(jì)算.......................................................................................22
4.4 循環(huán)泵到電脫水器之間管線的計(jì)算...................................................................22
4.5 電脫水器到加熱爐之間管線的計(jì)算...................................................................23
4.5.1 壓降計(jì)算...................................................................................................23
*********本科畢業(yè)設(shè)計(jì)(論文)
4.5.2 局部摩阻計(jì)算...........................................................................................23
4.6加熱爐到穩(wěn)定區(qū)之間管線的計(jì)算........................................................................24
4.7 穩(wěn)定區(qū)到外輸泵之間的管線計(jì)算.......................................................................24
4.8事故罐到循環(huán)泵之間管線的計(jì)算........................................................................24
結(jié)論......................................................................................................................................26
致謝......................................................................................................................................27
參考文獻(xiàn)...............................................................................................................................27
前言
第一章 前言
聯(lián)合站,即集中處理站,是油田地面集輸系統(tǒng)中的重要組成部分,就是把分散的原料集中、處理使之成為油田產(chǎn)品的過程,油田生產(chǎn)的必要環(huán)節(jié)。這個(gè)過程從油井井口開始,將油井生產(chǎn)出來的原油、伴生天然氣和其他產(chǎn)品,在油田上進(jìn)行集中、輸送和必要的處理、初加工,將合格的原油送往長距離輸油管線首站,或者送往礦廠油庫經(jīng)其他運(yùn)輸方式送到煉油廠或轉(zhuǎn)運(yùn)碼頭;合格的天然氣則集中到輸氣管線首站,再送往石油化工廠、液化合格的天然氣則集中到輸氣管線首站,再送往石油化工廠、液化氣廠或其他用戶。就油田的生產(chǎn)全局來說,油氣集輸是繼油藏勘探、油田開發(fā)、采油工程之后的很重要的生產(chǎn)階段。
隨著這些年油田采出原油含水率越來越高,聯(lián)合站在油田生產(chǎn)中的地位也日益顯得重要。相信在未來的油田的生產(chǎn)中聯(lián)合站的地位將會(huì)更加重要。
本次設(shè)計(jì)是更具任務(wù)書所給定的內(nèi)容以及經(jīng)過大量的計(jì)算和論證得出的一套可行的設(shè)計(jì)方案。